Container house supplier by lidamodularhouse.com: Installation Efficiency – Flat-packed container house: The quick installation process ensures shorter construction times. A team of four workers can complete the installation of a single modular house in just 3 hours. Alternatively, the houses can be transported in full containers and connected to water and electricity on-site for immediate use. Light steel movable plank building: The installation process is time-consuming, taking 20-30 days, including pouring concrete foundations, constructing the main body, installing color steel plates, suspending the ceiling, and installing water and electricity. This method poses a high risk of operation and labor loss. Find extra details at prefab houses China.
Container house is designed and developed according to the standard size of shipping container. It is of heatproof and waterproof. It is widely used as office, meeting room, dormitory, shop, booth, toilet, storage, kitchen, shower room and so on. Lida Flat Pack Container House is steel-frame structure, consisted with roofing frame, corner pillar and floor frame. All parts are prefabricated in factory and installed in site. Based on modular standard container house, container house can be grouped in horizontal and vertical. Flexible in layout and prefabricated to achieve different function purpose.
Lida T model prefab house (prefabricated house) is made of light steel as steel structure and sandwich panels for wall and roof. The sandwich panels can be polystyrene, polyurethane, rock wool and fiber glass sandwich panels for insulation. Lida T model prefab house (prefabricated house) is customized. The columns are made of square tube and are installed inside of the wall.The house can be assembled and disassembled more than 6 times, and the service life is more than 15 years.
Steel structure building is widely used as warehouse, workshop, showroom building, poultry farm, green house, mid-rise or high-rise steel building, airport terminal and hangar, etc. Lida Multi-Storey Steel Structure Building involves steel frame structure, steel frame-support structure, steel frame-concrete cylinder structure, steel frame – Concrete shear wall structure, etc. Lida Integrated Camps are widely used in General Contracting projects, Oil and gas field projects, Hydroelectric Projects, Military projects, mining sectors projects, and so on, which are intended for short- and long-term site mobilization.
The Lida Group Integrated Campsite Warehouse is an important part of the integrated camp. The camp warehouse is usually a separate building used to store all kinds of materials in the camp operation process. The size of the warehouse is individually tailored to the future operational needs of the camp contractor. The Lida Group’s comprehensive camp laundry room adopts a light steel structure skeleton and is maintained by composite plates or color steel. According to the requirements of the camp and the local environment, the composite panels are available in EPS, fiberglass, rock wool and PU panels. See more info at Lida Group.
Lida can provide large-scale farms and supporting facilities for customers. The chicken house is generally 6-15 meters wide and 30-100 meters long. The height of the flat coop is generally 2.2-2.4m, and the height of the high bed coop is about 5m. There are open type, windowed type and closed type in the chicken house, depending on the climate conditions. The exhibition hall is generally built with steel structure and glass curtain wall, simple and beautiful. This kind of structure is widely used in automobile exhibition hall and 4S shop.
Lida Group Prefabricated House Supplier was established in 1993, as a professional steel buildings factory and exporter which is concerned with the design, production, installation and marketing of engineering construction. Lida Group container house China manufacturer has achieved ISO9001, ISO14001, ISO18001, EU CE certification (EN1090) and passed SGS, TUV and BV inspection. And we has obtained Second Class Qualification of Steel Structure Professional Construction Contracting and General Contracting Qualification of Construction Engineering.